Rental hot water boilers

Keeping a building warm while its heating plant is out.

Site and equipment
Duty Building heat, domestic hot water, process loads not needing steam
Simpler than steam No steam trim, no blowdown, frequently no operator requirement
Sized on BTU/hr plus the supply and return temperatures the loop runs at
Flow Must move water through the existing loop, or bring a pump that can
Glycol Concentration changes heat transfer and flow requirement
Longest task Finding tie-in points that do not require draining the building

Whenever the load does not genuinely need steam, this is the easier answer.

Critical path

What actually gates the date

  1. 01 Load and loop BTU/hr, plus the supply and return temperatures the building actually runs at.
  2. 02 Tie-in survey Where the connection is made, and whether it can happen without draining the system. Usually the longest task.
  3. 03 Placement Where the unit sits and how the piping reaches it.
  4. 04 Delivery Transport scheduled against the date the heat has to be on.
  5. 05 Connections Your crew ties in and fills.
  6. 06 Startup Commissioned and handed over.
What it is

The short version

Hot water rentals cover building heat, domestic hot water, and process loads that do not need steam. They are usually simpler to place than steam units: no steam trim, no blowdown, and often no operator requirement. That makes them the better answer whenever the load does not genuinely need steam.

The connection is the main variable. Tying a temporary unit into an existing hydronic loop means matching flow and temperature and finding somewhere to make the connection without draining the building.

Specifying

What decides the selection

Load and temperature
BTU/hr, plus the supply and return temperatures the building loop actually runs at. A unit sized on BTU alone can still fail to hold the loop.
Flow and pump head
The temporary unit has to move water through the existing loop, or bring a pump that can.
Tie-in points
Where the connection is made, and whether it can be made without draining the system. This is usually the longest part of the job.
Fuel and utilities
Gas pressure and electrical service at the placement location.
Glycol
Whether the loop is glycol, and at what concentration. It changes the heat transfer and the flow requirement.
Before we quote

What to send us

Send what you have and we'll tell you what's missing. Knowing this up front is the difference between a quote this week and a quote after three rounds of questions.

Rental fleet announced at launch

We're finalizing manufacturer agreements now. Need something priced before then? We quote today.

Load
BTU/hr, or the nameplate of the unit being covered for.
Temperatures
Supply and return temperature required.
Loop
Flow rate, glycol percentage, and available tie-in points.
Utilities
Gas pressure and electrical service.
Placement
Where the unit sits and how the piping reaches it.
Dates
Start date and duration.

Have a spec, or just a nameplate?

Send what you have. We'll come back with selections, pricing, and lead times.