Parts

Gaskets and consumables

The cheap items that turn a one-day job into a three-day job when they are not on the truck.

At a glance
Covers Handhole and manhole gaskets, gauge glass, refractory, wear items
Order against The vessel make and model. Dimensions and material follow it
Buy the set The second trip costs more than the parts
Refractory Has a dry-out schedule. It belongs in the outage plan

"Standard handhole gasket" is not a specification.

Send this

3 things and we can price it

Get these in the first message and you get a price back, not a list of questions.

  1. 01 Boiler nameplate Make, model, and serial. A photo of the plate.
  2. 02 What is coming apart Which openings, and how many of each.
  3. 03 Outage dates When the work happens, so lead times are checked against the real date.
What it is

The short version

Handhole and manhole gaskets, gauge glass and sight glass sets, refractory and insulation, and the wear items consumed on every teardown.

None of it is interesting until it is missing. The common failure is ordering against a general description instead of the vessel, and discovering the mismatch with the boiler already open.

Getting it right

What makes it the right part

Order against the vessel
Gasket dimensions and material follow the boiler make and model. "Standard handhole gasket" is not a specification.
Material and temperature
Gasket material has to suit the pressure and temperature it sees, not just the opening it fills.
Buy the set
If the unit is coming apart, order every gasket it will need. The second trip costs more than the parts.
Refractory cure time
Refractory work has a dry-out schedule. It belongs in the outage plan, not in the last afternoon of it.

Have a spec, or just a nameplate?

Send what you have. We'll come back with selections, pricing, and lead times.

Get a parts quote