Parts

Retrofit packages

When the vessel is sound but the burner or the controls no longer meet the requirement.

At a glance
Two common jobs Low-NOx burner conversion, and control upgrades
Usual trigger An air district rule tightening under sound equipment
Quoted against What is actually installed, not a catalog configuration
Hardest constraint Available gas pressure at the train
Often decisive The outage window the facility can actually give up

First honest question: is the vessel worth it? A retrofit near end of life is money spent twice.

Send this

5 things and we can price it

Get these in the first message and you get a price back, not a list of questions.

  1. 01 Boiler and burner Nameplates for both, plus photos of the front and the gas train.
  2. 02 The requirement District, rule, target NOx, and compliance date.
  3. 03 Utilities Gas pressure at the train, electrical service, and stack arrangement.
  4. 04 Room Clearances in front of and around the boiler.
  5. 05 Window Available outage dates and duration.
What it is

The short version

Two retrofits come up repeatedly in this state. The first is a low-NOx burner conversion driven by an air district rule tightening under equipment that is otherwise fine. The second is a control upgrade on a boiler whose original system is obsolete or whose owner now wants trim, sequencing, or BAS visibility.

Both are quoted against what is actually installed rather than a catalog configuration, which is why a retrofit quote asks more questions than a new-equipment quote does.

Getting it right

What makes it the right part

Is the vessel worth it?
The first honest question. A retrofit on a boiler near the end of its life is money spent twice, and we would rather say so than quote it.
The rule that triggered it
Which district rule applies and by what date. It sets the target and often the schedule.
What has to stay
Existing footprint, gas train, stack, and electrical service all constrain the answer, and available gas pressure constrains it most.
Outage window
What downtime the facility can actually give up frequently decides the approach more than the technical options do.

Have a spec, or just a nameplate?

Send what you have. We'll come back with selections, pricing, and lead times.

Get a parts quote